George Owen, Assistant Site Manager, 'setting out' in less than ideal weather conditions.
A ledge has been cut out of the back wall of the site to support beams that will be placed over a void to the building.
Portacabins at the eastern end of the site with afternoon cloud building up.
Hafod Eryri just after completion of installing the roof sections.
The Kalzip roof sections with the insulation and vapour membrane visible.