Work has begun on excavating the footings for the new summit building at the western end of the site. This is alongside the painstaking work of separating out the twisted tangle of metal reinforcing rods from the concrete debris. Necessary in order to comply with disposal requirements.
  
At the Llanberis train terminus the u-shaped foundation units are being stock-piled ahead of being transported up the mountain. Once there the units will be in-filled with crushed rubble from the old building and capped with a pre-cast concrete lid. At the end of each unit a steel cage will be attached and filled with concrete to form a main load bearing attachment point. Trains continue to remove skip loads of material that can't be reused from the demolition work.


Foundation units at the Snowdon Mountain Railway, Llanberis.


Digging the footings for the new cafe has began at the western end of the site.


Separating the steel reinforcing rods from the concrete rubble.