snowdonia-active.com  
Re: An Aerial Perspective
by Anonymous
Having visited the summit on the gorgeous afternoon of April 19 and the first time to the summit since last years Snowdon Race i was surprised on seeing this new structure. Looking carefully at it for nearly half an hour i was trying to figure out what needs doing to finish it of. I was surprised really that a service train had not been provided to allow work to be carried out in this lovely weather,who knows what kind of summer we are in for, possibly the weather might be against work being carried out who knows. Really with a project as high profile as this one work should be done when the weather will allow.
Post comment:
Format Type: 
  Convert newlines
  Receive comment notifications for this article
Subject: 
   
insert bold tags insert italic tags insert underline tags insert strikethough tags insert link insert blockquote tags
Comment: 
Comment verification:

Please enter the text you see inside the graphic to post your comment:
You are not currently logged in. If you would like your user information to be displayed with your comment, please enter your login information below.
Login information:
Username: 
Password: 
If you would like to post contact information on your comment, please enter your information into the optional fields below:
Contact information:
Name: 
URL:  example: http://yourdomain.com
Email: 
Please note: email will not be displayed on the site, only for the blog owner. If logged in, URL will only be used.